Erection of lightweight solid slabs at the construction site
Abstract: The known foreign and domestic construction solutions of lightweight solid slabs in the construction site were studied. An analysis of innovative technologies for the construction of slabs with light inserts in the neutral zone of solid disk was presented. For each of the solutions features of concrete and control of reinforcement protection layer were described. The basic requirements for the production of lightweight solid slabs on site were determined. Technological sequence of construction technology of slabs with light inserts was described. The article presents data on the study of costs for installation and dismantling of formwork elements. The main comparative figures on labor input and solid lightweight concrete floors have been presented.
Keywords: slab, concrete, light inserts, blackouts, labor costs.
Pages: 221-229.
For citation:
For citation: Meneiliuk, A. I.; Shavva, K. I.; Taran, V. V. Erection of lightweight solid slabs at the construction site. – Text : electronic. – In: <em>Modern Industrial and Civil Construction</em>. – 2013. – Vol. 9, N 4. – Р. 221-229. – URL: https://donnasa.ru/publish_house/journals/spgs/2013-4/05_Meneiliuk_Shavva_Taran.pdf (date of access: 22.12.2024). – ISSN 1993-3495.
Vol. 9, N 4 (2013)
Journal: Modern Industrial and Civil Construction
Publish house: Donbas National Academy of Civil Engineering and Architecture
Journal: Modern Industrial and Civil Construction
Publish house: Donbas National Academy of Civil Engineering and Architecture